Flash Cove Angiocath Lab
This floor is 140 yds of Armstrong Medintech that was installed with 3 different colors in a simple bordered pattern. We flash coved the flooring 4” on all walls and heat welded the seams and corners with 3 colors matching heat thread. We had been told that the existing concrete subfloor had received an Ardex K15 pour so we were expecting no floor prep, but when we arrived we found that there was a lot of prep work to be done, because of a bad pour. This job had to be complete in 2 days because the cath equipment was arriving on the 3rd day. A seven man crew spent over half of the first day just prepping the subfloor; it required over 100lbs of SD-F. We worked like mad and were able to complete the job in a day and a half. These pictures show only a small part of the job. Mike gives a thumbs up for a job well done.
0 Comments:
Post a Comment
<< Home